翻訳と辞書
Words near each other
・ Jinpa Sonam
・ Jinpa-ri Tomb No. 1
・ Jinpa-ri Tomb No. 4
・ Jinpachi
・ Jinpachi Mishima
・ Jinpachi Nezu
・ Jinpen Dam
・ Jinpen, Nan County
・ Jinping
・ Jinping County, Guizhou
・ Jinping District
・ Jinping Hydropower Station
・ Jinping Miao, Yao, and Dai Autonomous County
・ Jinping Road Station
・ Jinping, Cili
Jinping-I Dam
・ Jinping-II Dam
・ Jinpu
・ Jinpyeong of Silla
・ Jinpyo
・ Jinpūkaku
・ Jinqiao
・ Jinqiao Road Station
・ Jinqing Caroline Cai
・ Jinraku-ji
・ Jinri Park
・ Jinrikisha Station
・ Jinryō Station
・ Jins
・ Jinsa of Baekje


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Jinping-I Dam : ウィキペディア英語版
Jinping-I Dam

The Jinping-I Dam (simplified Chinese: 锦屏一级水电站; traditional Chinese: 錦屏一級水電站) also known as the Jinping-I Hydropower Station or Jinping 1st Cascade, is a tall arch dam on the "Jinping Bend" of the Yalong River (Yalong Jiang) in Liangshan, Sichuan, China. Construction on the project began in 2005 and was completed in 2014. Its power station has a 3,600 MW capacity to produce between 16 and 18 TW·h (billion kW·h) annually. Supplying the power station is a reservoir created by the 305-meter-tall arch dam, the tallest in the world. The project's objective is to supply energy for expanding industrialization and urbanization, improve flood protection, and prevent erosion.
== History ==
Harnessing hydropower on the Jinping bend of the Yalong River has been in planning for decades. The length of bend is 150 km but the downstream part of the river on the opposite side is only separated by 16 km. Between that distance, there is an elevation drop of 310 m, creating an excellent situation for hydroelectricity production. Two projects were planned for the bend, the Jinping I and Jinping II with a combined capacity of 8,400 MW. Planning for the projects began in the 1960s under the former Sichuan and Shanghai design institutes along with the Ministry of Water Resources and Electric Power. They produced the "Reinvestigation Report on The Yalong River bend (Jinping)". In July 1965, the Jinping Hydropower Engineering Headquarters was set up and designs for the Jinping 1 and Jinping 2 would progress with the East China Investigation and Design Institute.〔(The Big River Bend and The "Jinping Dream" )〕
Construction began on 12 November 2005. The dam began to impound its reservoir on 8 October 2012. First power was generated in 2013 with the remainder of the work to be completed by 2015. The rapid impounding has been linked to reservoir-induced seismicity by a Chinese geologist. Out of hundreds of small earthquakes during impoundment, three between 3.9''MW'' and 4.58''MW'' were recorded on 22 November 2013 on a nearby fault line.
The dam began to impound its reservoir on 8 October 2012 and the first two of six 600 MW generators became operational on 30 August 2013. The sixth and final generator was commissioned on 15 July 2014. The final generator for Jinping-II downstream was commissioned in November 2014.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Jinping-I Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.